Gemini 3.8 Flash vs Gemini 4 Hydrogen pricing
Side-by-side LLM API pricing.Gemini 3.8 Flash is cheaper on input ($0.75 vs $1.50 /1M), and Gemini 3.8 Flash is cheaper on output ($3.75 vs $7.50 /1M). On a blended average, Gemini 3.8 Flash is lower — but which wins for you depends on your input/output mix, so check the example workloads below or run the calculator.
| Attribute | Gemini 3.8 Flash | Gemini 4 Hydrogen |
|---|---|---|
| Provider | ||
| Tier | Mid-range | Mid-range |
| Status | GA | GA |
| Context window | 1M | 1.05M |
| Input /1M | $0.75 | $1.50 |
| Output /1M | $3.75 | $7.50 |
| Cached input /1M | $0.075 | $0.075 |
| Batch input /1M | $0.375 | $0.75 |
| Batch output /1M | $1.88 | $3.75 |
| Blended (avg in+out) | $2.25 | $4.50 |
| 1M in + 1M out | $4.50 | $9.00 |
| 1M in (90% cached) + 100K out | $0.5175 | $0.9675 |
List prices, USD, directional. Rates are provider list prices per 1M tokens and are meant for comparison, not billing. Batch rates shown as 50% off are derived where a provider offers batch but does not publish a separate figure. Preview, promo, intro, peak/off-peak, long-context, and third-party-host prices are labeled where they apply. Token counts vary by tokenizer, so per-token price is not always a like-for-like cost. Always confirm with the provider before relying on a number. Prices as of 2026-11-02.
Which should you pick?
For a balanced job (1M input + 1M output), Gemini 3.8 Flash costs $4.50 versus $9.00. If your prompts are large and reused, prompt caching changes the maths — the cache-heavy row above shows a 90%-cached input scenario. If your work can run asynchronously, both providers' batch rates cut the bill further where offered.
Full price matrices: Gemini 3.8 Flash pricing → · Gemini 4 Hydrogen pricing → · Back to the LLM pricing hub →